Covered Bridge
Set-Up and Take-Down
Time lapse video coming Soon!
The bridge pieces are stored on individual custom-made carts. Here are the three base pieces of the bridge.
The bridge pieces are stored on individual custom-made carts. Here are the three base pieces of the bridge.
Roof trusses storage cart.
Roof trusses storage cart.
The bridge was built on a level area, so after we determined where we were going to set it up each year, I made some leveling platforms to accommodate our sloped driveway.
The bridge was built on a level area, so after we determined where we were going to set it up each year, I made some leveling platforms to accommodate our sloped driveway.
Our grandkids love to help!
Our grandkids love to help!
Assembly is hard work and (Maddie) needed to rest!
Assembly is hard work and (Maddie) needed to rest!
Finished setting up in record time! It took about 5.5 hours the first year and only 1.5 hours in 2023!
Finished setting up in record time! It took about 5.5 hours the first year and only 1.5 hours in 2023!
The final product.
The final product.
Ready to take down the bridge in November
Ready to take down the bridge in November
Many hands make light work
Many hands make light work
Successfully taken down and ready for storage!
Successfully taken down and ready for storage!